Licensed. Bonded. Insured. Serving Grays Harbor, Mason & Thurston Counties Call Us: 360-463-1098

Slab foundations

Monolithic Slabs in Grays Harbor, Mason & Thurston Counties

Monolithic slab foundations for shops, garages and outbuildings, with the footing and the floor poured as one piece.

Crew tying rebar for a slab before the pourStock photo

Monolithic slab foundations

One pour, footing and floor together

A monolithic slab has thickened edges that act as the footing, poured at the same time as the floor. One pour means fewer steps, fewer joints and a faster path from bare ground to a building. It is a common choice for shops, detached garages and outbuildings on reasonably flat sites.

We work from your building plans or kit specs, set the forms and reinforcement, place anchor bolts where the walls will go, and pour. If the building needs a permit, the county usually inspects the forms and steel before the pour, and we schedule around that.

What's included

What every job includes

Layout to your plans

Square, level and sized to your building.

Excavation and grading

Site prep with our own small tractor.

Thickened edges

Footings formed into the slab perimeter.

Reinforcement and anchors

Rebar, plus anchor bolts or hardware where the walls attach.

Pour and finish

Smooth trowel finish ready for the build.

Licensed. Bonded. Insured.

Licensed, bonded and insured in Washington. [PLACEHOLDER: WA contractor registration #]

Local know-how

Shops and outbuildings on rural lots

Shops, pole barns and garages are a big part of life on acreage in Mason and Grays Harbor counties. Access matters on these jobs: how a concrete truck gets to the pad, and whether the ground stays firm in the wet months. We look at that at the quote so pour day goes smoothly. [PLACEHOLDER: whether Fontaine uses a pump truck for hard-to-reach pads]

Concrete finisher smoothing a fresh slab with a power trowelStock photo

How it works

Our process

  1. Free quote

    Tell us about the project. We come look at the site, talk through options and give you a clear price.

  2. Prep

    Excavation, grading, base and forms, all done before a drop of concrete shows up.

  3. Pour and finish

    The crew pours, levels and finishes in one push for a consistent surface.

  4. Cleanup and walkthrough

    We clean up, walk you through the finished job and tell you how to care for it. [PLACEHOLDER: confirm cure and care guidance]

Questions

Monolithic Slabs FAQ

Have a question that isn't here? Call 360-463-1098.

What is the difference between a monolithic slab and a stem wall foundation?

A monolithic slab pours the footing and floor together and suits flat sites. A stem wall foundation builds the footing and short walls first, then the floor, and handles sloped sites better. We will tell you which fits your lot.

Do I need a permit for a shop slab?

If the building itself needs a permit, the foundation is part of it, and an inspection is usually required before the pour. Your building permit will say. We work with the inspection schedule.

Can you prep the site too?

Yes. Clearing, grading and base work are done in-house with our small tractor, so there is one crew from dirt to slab.

How big a slab can you pour?

[PLACEHOLDER: confirm practical size range]

Where we work

Monolithic Slabs near you

Based in Shelton and serving Grays Harbor, Mason and Thurston counties.

Free quotes

Planning a shop or garage?

Let's start the conversation today!

Or call us: 360-463-1098

  • Family-owned since 1996
  • Licensed. Bonded. Insured.
  • Grays Harbor, Mason & Thurston Counties

Request a quote